197 comments on Peak Oil Media: Buffett on Net Energy and Peak Oil and Lovelock on Putting Your Head Between Your Legs and Kissing Your...
Comments can no longer be added to this story.
| Show without comments | PDF version
197 comments on Peak Oil Media: Buffett on Net Energy and Peak Oil and Lovelock on Putting Your Head Between Your Legs and Kissing Your...
Comments can no longer be added to this story.
| Show without comments | PDF version
Search The Oil Drum with Google
Support The Oil Drum
Recently on TOD:World
TOD:Campfire
- What "Lower Consumption" Means
- Tricking and Treating the Future
- Meeting Energy Decline Part-Way - Potatoes?
TOD:Europe
- The US stimulus and "green jobs"
- EROWI - energy return of water invested
- An interview with Stoneleigh - the case for deflation
TOD:Canada
- In this house, we obey the laws of thermodynamics!
- The Round-Up: October 24, 2008
- Compressed Air Energy Storage - How viable is it?
TOD:Australia/NZ
- The Bullroarer - Saturday 7th November 2009
- The Bullroarer - Friday 30th October 2009
- Details of Solar Flagships Released
TOD:Net Energy
Blogroll
Energy Sites
- The Coming Global Oil Crisis
- Die Off
- Dry Dipstick
- Energy Bulletin
- From the Wilderness
- Life After the Oil Crash
- Peak Oil Crisis
- Peak Oil News and Message Boards
- Powerswitch
- Rigzone
- Matthew Simmons
- Wolf at the Door
Environment & Sustainability Sites
- The Daily Green
- EcoGeek
- Eco Street
- Green Car Congress
- Green Options
- green.alltop.com
- Gristmill
- RealClimate
- Sustainablog
- Treehugger
- WorldChanging
Blogs
- The Big Picture
- Casaubon's Book
- Cleantech Blog
- Clusterf
k Nation (Jim Kunstler) - The Cost of Energy
- David Strahan
- The Energy Blog
- Entropy Production
- European Tribune
- GraphOilology
- Health After Oil
- jeffvail.net
- Mobjectivist
- Peak Energy (Australia)
- Peak Energy (USA)
- R-Squared
- Resource Insights
Finance & Economics Blogs
- Calculated Risk
- The Crash Course
- Ecological Economics
- Econbrowser
- Environmental Economics
- Infectious Greed
- The Mess That Greenspan Made
- Mish's Global Economic Trend Analysis
Organizations
Peak Oil Primers
Beware email scams!
Beware email scams claiming to be from this site. We do not have any job openings. If anyone contacts you about a job at The Oil Drum, do not reply to them, and definitely do not give them any personal information or send them money. Read more here.
“What people need to hear loud and clear is that we're running out of energy in America.”
—George W. Bush, May 2001
User login
Contact
- Content: editors at theoildrum dot com
- Tech support: support at theoildrum dot com
Personnel
- Editors: Nate Hagens, Gail the Actuary, Prof. Goose
- DrumBeat Editor: Leanan
- Contributors: ace, Engineer-Poet, Heading Out, jeffvail, JoulesBurn, Sam Foucher, Robert Rapier
- TOD:Campfire: Glenn, Jason Bradford
- TOD:Europe: Chris Vernon, Euan Mearns, Francois Cellier, Jerome a Paris, Luís de Sousa, Rembrandt, Rune Likvern, Ugo Bardi
- TOD:Canada: benk, Libelle
- TOD:ANZ: Big Gav, Phil Hart, aeldric
- Emeritus: Stuart Staniford
- Technician: Super G
License
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 United States License.










GAIA Host Collective
You remark on energy costs being more loosely related to energy costs sounds well-founded.
However, in a situation of very tight oil and with the constraints on natural gas production that have been noted on this blog it would seem that gas prices are also likely to rise a lot.
Coal also seems relatively constrained, and although the system of long term contracts may delay rises they will not halt them in the long run, so spot prices for coal perhaps act as some sort of proxy for the trends in the market.
I can't see demand from India and China slowing much for materials though, and financing new mines is not proving easy at the moment, so for the next few years at least materials costs seem likely to remain high - and as you say, the short term is proving problematic.
I accept your point about nacelle costs, but high material costs in general will have a far greater impact on wind than nuclear.
"Coal also seems relatively constrained"
Not really. It's a short-term question of building infrastructure - ports, rail, etc.
"high material costs in general will have a far greater impact on wind than nuclear."
Well, wind costs rose from an recent historical average of $1.50/watt to $1.80 in 2007 - that's not a big increase. The fundamental costs are falling due to increasing size & better technology, and turbine manufacturing capacity will catch up, so a price rise is a temporary blip.
By the time we could get the infrastructure built for significant coal use, and the exporting countries had done so, or we built new mines if resources are available, we could be deep into a nuclear build and save the CO2.
Have you a source for your wind-power costs - since you are talking in dollars, I assume that they relate to US costs, which has a different cost base to the UK and a better on-shore wind resource in many areas.
Even in the US the most recent figures I have seen are for the T Boone Pickens 4GW nameplate facility in Texas, which is going to cost $10bn and would generate and average hourly energy flow of around 1.4GW - much less during Texan peak demand in the summer.
If I have not lost a decimal place that is over $6 a watt rather than $1.8, unless you are talking about some kind of levelised cost which can show just about anything depending on the assumptions put in - presumably once again you are talking about nameplate capacity, which is just downright confusing in the case of wind, however as you say it may be useful in comparing the scale of the price rise - you don't though give a date for the $1.50 figure.
If I have the Picken's figures right though on a nameplate basis that still works out as $2.50 watt nameplate, not $1.80
The figures I have based my costs on are 2006 UK Government figures - costs will have risen since then.
"By the time we could get the infrastructure built for significant coal use, and the exporting countries had done so, or we built new mines if resources are available, we could be deep into a nuclear build and save the CO2."
New infrastructure in the US, such as rail, is a 1-3 year thing, not a 10 year thing. I think Australia has a port capacity bottleneck - I'm not sure on a timeline there. Anyone have info?
My source on recent historical costs was FPL, though I don't have a link. The 2007 data is nameplate (for comparison purposes) for both the US and the world - overall stats on new capacity and dollars spent (which may exaggerate costs, from a PPP standpoint) - I'll see if I can find a link.
Don't forget the scarcity pricing for wind turbines: manufacturers have a 2 year backlog.
Here is a link to the Pickens 4GW $10bn project:
http://www.nytimes.com/2008/02/23/business/23wind.html?_r=1&oref=slogin&...
There is one heck of a price difference here, $2.50 watt against your figure of $1.80.
That's about a 65% price increase against your original $1.50
I am not saying your figures are like this, but I am pretty suspicious of costings in the renewables industry, they often seem to have taken off subsidies first, and in general got up to all sorts of games, just so long as they get their subsidies - the market basically stopped when Denmark stopped them.
I am particularly interested in your statement that the increase in costs is mainly due to supply shortages in the nacelles rather than rising material costs - have you got any breakdowns on this?
I'll see what I can find on Pickens, and nacelle costs.
" I am pretty suspicious of costings in the renewables industry, they often seem to have taken off subsidies first"
I'd note that we're talking about capital costs, and subsidies typically don't apply to capital costs.
"the market basically stopped when Denmark stopped them."
That doesn't tell us much. Developers may have been waiting for resumption, or gone somewhere else where things were slightly better. We should note that most sources of energy would halt without subsidies, explicit or implicit, such as guaranteed utility reimbursement for investment (a key factor in general), CO2 externalities, or Price-Anderson.