The capacity of the BTC pipeline is 1 mbpd, but at the time it went off-line it was pumping 800 kbpd.

But that's just the BTC.

Oil was also moving by rail thru Batumi and the Baku Supska pipeline.

1.2 mbpd was the figure I think.