Re: 100,000 BPD project
I`m having trouble estimating how much producing THAI wells that would represent. What is the nominal flow rate (net of water volumes) expected from a single producing well? is it 2,000 BPD/well?
"What is the nominal flow rate (net of water volumes) expected from a single producing well?"
555 BPD/well x 18 wells = 10,000 BPD partially upgraded bitumen.