24 comments on More on Rig Damage and Structural Integrity
Comments can no longer be added to this story.
| Show without comments | PDF version
24 comments on More on Rig Damage and Structural Integrity
Comments can no longer be added to this story.
| Show without comments | PDF version
Search The Oil Drum with Google
Support The Oil Drum
Recently on TOD:World
TOD:Campfire
- Thanksgiving Open Campfire Thread
- How Relocalization Worked
- How to Set Up and Run a Bicycle Repair Company
TOD:Europe
- Unique Times -- and the Future
- Peak Gold, Easier to Model than Peak Oil? - Part I
- Carbon Capture and Storage
TOD:Canada
- In this house, we obey the laws of thermodynamics!
- The Round-Up: October 24, 2008
- Compressed Air Energy Storage - How viable is it?
TOD:Australia/NZ
- The Bullroarer - Friday 27th November 2009
- International Energy Agency calls 'Peak' on OECD Oil Demand
- Australian Senate: Peak Oil motion defeated 31:6
TOD:Net Energy
Blogroll
Energy Sites
- The Coming Global Oil Crisis
- Die Off
- Dry Dipstick
- Energy Bulletin
- From the Wilderness
- Life After the Oil Crash
- Peak Oil Crisis
- Peak Oil News and Message Boards
- Powerswitch
- Rigzone
- Matthew Simmons
- Wolf at the Door
Environment & Sustainability Sites
- The Daily Green
- EcoGeek
- Eco Street
- Green Car Congress
- Green Options
- green.alltop.com
- Gristmill
- RealClimate
- Sustainablog
- Treehugger
- WorldChanging
Blogs
- Casaubon's Book
- Cleantech Blog
- Clusterf
k Nation (Jim Kunstler) - The Cost of Energy
- David Strahan
- Early Warning
- The Energy Blog
- European Tribune
- GraphOilology
- Health After Oil
- jeffvail.net
- Mobjectivist
- Peak Energy (Australia)
- Peak Energy (USA)
- R-Squared
- Resource Insights
Finance & Economics Blogs
- The Big Picture
- Calculated Risk
- The Crash Course
- Ecological Economics
- Econbrowser
- Environmental Economics
- Infectious Greed
- The Mess That Greenspan Made
- Mish's Global Economic Trend Analysis
Organizations
Peak Oil Primers
Beware email scams!
Beware email scams claiming to be from this site. We do not have any job openings. If anyone contacts you about a job at The Oil Drum, do not reply to them, and definitely do not give them any personal information or send them money. Read more here.
“Of all races in an advanced stage of civilization, the American is the least accessible to long views… Always and everywhere in a hurry to get rich, he does not give a thought to remote consequences; he sees only present advantages… He does not remember, he does not feel, he lives in a materialist dream.”
—Moiseide Ostrogorski (1902, 302-303)
User login
Contact
- Content: editors at theoildrum dot com
- Tech support: support at theoildrum dot com
Personnel
- Editors: Nate Hagens, Gail the Actuary, Prof. Goose
- DrumBeat Editor: Leanan
- Contributors: ace, Engineer-Poet, Heading Out, jeffvail, JoulesBurn, Sam Foucher, Robert Rapier
- TOD:Campfire: Glenn, Jason Bradford
- TOD:Europe: Chris Vernon, Euan Mearns, Francois Cellier, Jerome a Paris, Luís de Sousa, Rembrandt, Rune Likvern, Ugo Bardi
- TOD:Canada: benk, Libelle
- TOD:ANZ: Big Gav, Phil Hart, aeldric
- Emeritus: Stuart Staniford
- Technician: Super G
License
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 United States License.










GAIA Host Collective
In the deepwater, they need to be tied back to a floater for processing and pipeline maintence. Deepwater sea temperatures are damn cold. They cause all kinds of pipeline flow issues. And shut them down. Flow assurance is now a science and there is a ton of active work ongoing to lower the costs for these operations. Currently methanol or ethylene glycol injections into the pipleines are required to ensure flow. This adds to the complexity and expense of the project.
There's also a ton of research being done in subsea separation (get rid of solids and water at the seafloor, eliminating pipeline capacity to carry it all), subsea elecric transmission (to power subsea pumps and equipment) and artificial islands (subsea floating platforms ro reduce sea state risk, but also to lower drilling costs (1st or 2nd gen semi to drill instead of a 4th or 5th).
I was actually thinking of an arrangement where the equipment would be mounted in something like a submarine hull, which could be taken down to a safe depth when storms threatened. The hull could be filled with air at near-ambient pressure when at depth (obviously with no one aboard) so it would not have to be built to withstand crushing. If it was only taken deep for protection, it would not need to be designed to operate while deep and pressurized, just to protect itself (e.g. chambers and pipes holding low-pressure gas would have to resist crushing). 300 feet should be deep enough to handle 100-foot waves.
There's got to be a point where submersibility is cheaper than building to resist storm loads. The question is where.
Chris