107 comments on Wind power: some lessons from 2006
Comments can no longer be added to this story.
| Show without comments | PDF version
107 comments on Wind power: some lessons from 2006
Comments can no longer be added to this story.
| Show without comments | PDF version
Search The Oil Drum with Google
Support The Oil Drum
Recently on TOD:World
TOD:Campfire
- Thanksgiving Open Campfire Thread
- How Relocalization Worked
- How to Set Up and Run a Bicycle Repair Company
TOD:Europe
- Unique Times -- and the Future
- Peak Gold, Easier to Model than Peak Oil? - Part I
- Carbon Capture and Storage
TOD:Canada
- In this house, we obey the laws of thermodynamics!
- The Round-Up: October 24, 2008
- Compressed Air Energy Storage - How viable is it?
TOD:Australia/NZ
- The Bullroarer - Friday 27th November 2009
- International Energy Agency calls 'Peak' on OECD Oil Demand
- Australian Senate: Peak Oil motion defeated 31:6
TOD:Net Energy
Blogroll
Energy Sites
- The Coming Global Oil Crisis
- Die Off
- Dry Dipstick
- Energy Bulletin
- From the Wilderness
- Life After the Oil Crash
- Peak Oil Crisis
- Peak Oil News and Message Boards
- Powerswitch
- Rigzone
- Matthew Simmons
- Wolf at the Door
Environment & Sustainability Sites
- The Daily Green
- EcoGeek
- Eco Street
- Green Car Congress
- Green Options
- green.alltop.com
- Gristmill
- RealClimate
- Sustainablog
- Treehugger
- WorldChanging
Blogs
- Casaubon's Book
- Cleantech Blog
- Clusterf
k Nation (Jim Kunstler) - The Cost of Energy
- David Strahan
- Early Warning
- The Energy Blog
- European Tribune
- GraphOilology
- Health After Oil
- jeffvail.net
- Mobjectivist
- Peak Energy (Australia)
- Peak Energy (USA)
- R-Squared
- Resource Insights
Finance & Economics Blogs
- The Big Picture
- Calculated Risk
- The Crash Course
- Ecological Economics
- Econbrowser
- Environmental Economics
- Infectious Greed
- The Mess That Greenspan Made
- Mish's Global Economic Trend Analysis
Organizations
Peak Oil Primers
Beware email scams!
Beware email scams claiming to be from this site. We do not have any job openings. If anyone contacts you about a job at The Oil Drum, do not reply to them, and definitely do not give them any personal information or send them money. Read more here.
“To be thrown upon one's own resources, is to be cast into the very lap of fortune; for our faculties then undergo a development and display an energy of which they were previously unsusceptible.”
—Benjamin Franklin
User login
Contact
- Content: editors at theoildrum dot com
- Tech support: support at theoildrum dot com
Personnel
- Editors: Nate Hagens, Gail the Actuary, Prof. Goose
- DrumBeat Editor: Leanan
- Contributors: ace, Engineer-Poet, Heading Out, jeffvail, JoulesBurn, Sam Foucher, Robert Rapier
- TOD:Campfire: Glenn, Jason Bradford
- TOD:Europe: Chris Vernon, Euan Mearns, Francois Cellier, Jerome a Paris, Luís de Sousa, Rembrandt, Rune Likvern, Ugo Bardi
- TOD:Canada: benk, Libelle
- TOD:ANZ: Big Gav, Phil Hart, aeldric
- Emeritus: Stuart Staniford
- Technician: Super G
License
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 United States License.










GAIA Host Collective
I was watching a documentary oabout factory that makes Wind Turbines in Germany and was wondering why the Turbine had to be at the top of the tower? Particularly the land based ones. Now I am no engineer but it looked like the turbine is geared anyway so why not have a shaft leading to the bottom of the tower? I accept that there may be some loss of energy but they would be so much easier (cheaper) to maintain!
Terb bulls eye
- and exactly what I have been trying to figure for years now...!
The problem with the WTs are the enormous torques they must endure, particularly the start momentum ... the forces involved chew gears like kids chew gum.
So adding a 90dg angular/beveled gear would probably add to these issues - and a loss of maybe 20% ...
The larger 5MW WTs are really heavy up there, the Nacelle with components plus the 3-blades weigh 310 tons - OR the same as 310 nos of 1ton automobiles - IT all put on top of the tower ...wow.
These 5MW WTs need to be started up by a separate motor, in order to start their mission. An average tower is at some 5 million Pound Sterling - only the tower.
... and it all done on purpose at free will – peak-energy is around and we scramble for solutions – the power table submitted tells me all (!)
see the below image for the innards of a typical turbine.
This is the fellah I described above - M5000 Multibrid - How do they do this ...? I mean it is impressive stuff, but is it smart anymore - for such intermittant power. I read somewhere ( iI think Edmonton/Calgary ?- Canada) the local grid had too many WTs in their mix, rendering disruptions at low winds ... too many eggs in the same basket ... the WT basket(!)
The airbus A380 is maximum large as per overall size, had they made it larger, AND they had to alter the airports as well.... there is a limit for "stuff" -