340 comments on Multiple Birds – One Silver BB: A synergistic set of solutions to multiple issues focused on Electrified Railroads
Comments can no longer be added to this story.
340 comments on Multiple Birds – One Silver BB: A synergistic set of solutions to multiple issues focused on Electrified Railroads
Comments can no longer be added to this story.
Search The Oil Drum with Google
Recently on TOD:World
TOD:Local
- Streets: Utilitarian Corridors or Livable Public Space
- Summer Streets a Success!
- Plan for Hydro-Fracture Drilling for Unconventional Natural Gas in Upstate New York
TOD:Europe
- Oilwatch Monthly - November 2008
- The 2008 IEA WEO - Production Decline Rates
- The EU Strategic Energy Review: maybe not so depressing after all
TOD:Canada
- The Round-Up: October 24, 2008
- Compressed Air Energy Storage - How viable is it?
- Oil Megaproject Update (July 2008)
TOD:ANZ
Blogroll
Energy Sites
- The Coming Global Oil Crisis
- Die Off
- Dry Dipstick
- Energy Bulletin
- From the Wilderness
- Life After the Oil Crash
- Peak Oil Crisis
- Peak Oil News and Message Boards
- Powerswitch
- Rigzone
- Matthew Simmons
- Wolf at the Door
Environment & Sustainability Sites
- The Daily Green
- EcoGeek
- Eco Street
- Green Car Congress
- Green Options
- green.alltop.com
- Gristmill
- RealClimate
- Sustainablog
- Treehugger
- WorldChanging
Blogs
- The Big Picture
- Casaubon's Book
- Cleantech Blog
- Clusterf
k Nation (Jim Kunstler) - The Cost of Energy
- David Strahan
- The Energy Blog
- Entropy Production
- European Tribune
- GraphOilology
- jeffvail.net
- Mobjectivist
- Peak Energy (Australia)
- Peak Energy (USA)
- R-Squared
- Resource Insights
Finance & Economics Blogs
- Calculated Risk
- Ecological Economics
- Econbrowser
- Environmental Economics
- Infectious Greed
- The Mess That Greenspan Made
- Mish's Global Economic Trend Analysis
Organizations
“He that will not apply new remedies must expect new evils, for time is the greatest innovator.”
—Francis Bacon, Essays
User login
Contact
- Content: editors at theoildrum dot com
- Tech support: support at theoildrum dot com
Personnel
- Editors: Prof. Goose, Heading Out, Stuart Staniford, Nate Hagens
- DrumBeat Editor: Leanan
- Contributors: ace, Engineer-Poet, Gail the Actuary, jeffvail, JoulesBurn, Khebab, Robert Rapier
- TOD:Local: Glenn
- TOD:Europe: Chris Vernon, Euan Mearns, Francois Cellier, Jerome a Paris, Luís de Sousa, Rembrandt, Rune Likvern, Ugo Bardi
- TOD:Canada: benk, Libelle
- TOD:ANZ: Big Gav, Phil Hart, aeldric
- Technician: Super G
License
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 United States License.





GAIA Host Collective
Vicksburg bridge must be electrified.
KCS Meridian Speedway.
http://www.youtube.com/watch?v=2SPlbDzLXIY&feature=related
To take pressure off Memphis, if nothing else.
And/or electric must be able to switch to diesel.
The most likely solution when overhead wire just will not fit (New Orleans Huey Long double track bridge will be tight at spots) is to fit a 3rd rail. Eurostar trains can switch from 25 kV AC to 1.5 kV DC third rail when they get close to London (no longer needed as of a year ago).
The beauty of rail is that innumerable issues have already been resolved somewhere in the world in the last century.
Best Hopes,
'
Alan
go for it, and good luck.
Trains are the future.
James
Alan,
With a certain amount of digging, you can lower the track within the tunnel to get the overhead wire to fit. This has been done in North London to get Eurostar trains from the Acton depot to St Pancras through the Hampstead tunnel (built in the late 1850s).
BobE
This is common approach, just lower the floor of the tunnel. Norfolk Southern is doing this to a East-West line to allow double stack containers.
Bridges can be more complex.
Best Hopes for solutions,
Alan
Or put in a third rail. A large Steel rail is much cheaper than a copper wire and can carry more electricity. And you don't have as many height clearance problems.