In my opinion, the process will likely export electrical power to the grid as the available joules in the lean process gas are considerably in excess of the 25 Megawatts called for in the permit energy balance for plant utilities.
I'm wondering if the process is capable of using the process gas from operating wells to start new wells. If this is the case, the limits on THAI are effectively removed. Surface mining and SAGD require natural gas to produce hot water and steam, but THAI supplies its own process heat.
I suppose the next step is to do on-site coking to upgrade the full product stream to something that requires no diluent.
"I suppose the next step is to do on-site coking to upgrade the full product stream to something that requires no diluent."
The next step is catalytic cracking in the reservoir to further upgrade the product to reduce/eliminate the need for diluent and this article gives a good overview.
WHAT LIES BENEATH
Poised to launch the CAPRI component of its in situ toe-to-heel air injection production technology, Petrobank aims to upgrade bitumen before it ever comes to the surface http://www.oilweek.com/articles.asp?ID=601
I'm wondering if the process is capable of using the process gas from operating wells to start new wells. If this is the case, the limits on THAI are effectively removed. Surface mining and SAGD require natural gas to produce hot water and steam, but THAI supplies its own process heat.
I suppose the next step is to do on-site coking to upgrade the full product stream to something that requires no diluent.
"I suppose the next step is to do on-site coking to upgrade the full product stream to something that requires no diluent."
The next step is catalytic cracking in the reservoir to further upgrade the product to reduce/eliminate the need for diluent and this article gives a good overview.
WHAT LIES BENEATH
Poised to launch the CAPRI component of its in situ toe-to-heel air injection production technology, Petrobank aims to upgrade bitumen before it ever comes to the surface
http://www.oilweek.com/articles.asp?ID=601